EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
NewtonRV-14A
-
Listing for Category : 8: horizstab
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (478)
Research
Workshop
- (3)
-
Portable Evaporative...
-
Build Worktables
-
Built/Completed...
Empennage
- (8)
-
Paid for Freight on...
-
Inventory
-
Tail Kit Arrived
-
Crate Date - Empennage
-
Ordered Tail Kit
-
Submitting Final...
6: Vert Stab
- (8)
-
Cleco Vs structure...
-
Match drill the skin...
-
Disassemble vstab...
-
Debur and Prime...
-
Debur and Prime Vert...
-
Dimpled vstab skin...
-
Dimple the vstab...
-
Complete Vstab...
7: Rudder
- (27)
-
Begin Rudder...
-
Continue prepping...
-
Fitted and Match...
-
Finished Prepping...
-
Debur Rudder...
-
Fitted Skins and...
-
Drill Trailing Edge,...
-
Scuffed the inside...
-
Dimpled Skins and...
-
Ordered Replacement...
-
Primed rudder skins...
-
Back Riveted Rudder...
-
Riveted two halves...
-
Deburred, primed,...
-
Rivet doubler and...
-
Assembled and...
-
Pulled and prepared...
-
Cut and prepped spar...
-
Debur Front Spar
-
Fit and Drill 1 of 2...
-
Cleco rudder...
-
Riveted lower rib...
-
Riveted Rudder Skins...
-
Riveted top rib and...
-
Rolled and Riveted...
-
Drilled out rivets...
-
Rolled Rudder...
8: HorizStab
- (15)
-
Deburred Replacement...
-
Drilled Front Spar
-
Deburred all parts...
-
Begin prepping Hstab...
-
Prepping HStab Ribs
-
Prepping HStab Ribs
-
Prepping hstab ribs
-
Hstab: dimple ribs,...
-
Hstab: dimple and...
-
Hstab: begin...
-
Hstab: rivet ribs to...
-
HStab: Begin...
-
Hstab: rivet nose...
-
Hstab: finish...
-
Hstab: completed...
9: Elevator
- (42)
-
Elevator: Begin...
-
Elevator: Rib Prep
-
Elevator: Finish rib...
-
Elevator: prep one...
-
Elevator: completed...
-
Elevator: Cut foam...
-
Elevator: Pulled...
-
Elevator: debur...
-
Elevator: finish...
-
Elevator: cleco most...
-
Elevator: prep and...
-
Elevator: drill...
-
Elevator: Finished...
-
Elevator:...
-
Elevator: Deburring...
-
Elevator: deburring...
-
Elevator: Complete...
-
Ordered Replacement...
-
Elevator: debur and...
-
Elevator: Dimpled...
-
Elevator: finished...
-
Elevator: Dimpling ribs
-
Elevator: trim...
-
Elevator: drill out...
-
Elevator: trim tab...
-
Elevator: prime trim...
-
Elevator: prep...
-
Elevator: prep right...
-
Elevator: prep left...
-
Elevator: prime left...
-
Elevator: finish...
-
Elevator: rivet tip...
-
Elevator: rivet...
-
Elevator: rivet...
-
Elevator: riveting...
-
Elevator: Rivet...
-
Elevator: riveting...
-
Elevator: finish...
-
Elevator: adhere...
-
Elevator: assemble...
-
Elevator: finish...
-
Elevator:...
10:Rear Fuselage
11:Emp Attach
12: Emp Fairings
Wings
- (12)
-
Wings: AFS Roll...
-
Wing Kit Backordered...
-
Wings: Inventory List
-
Finish Inventory
-
Inventory
-
Inventory
-
Wings - Shipping Notice
-
Wings: Begin Inventory
-
Wing Kit Received
-
Freight Bill on Wings
-
Wings: Final Billing
-
Ordered Wing Kit
13:Main WingSpar
- (14)
-
Main Spar: FINISH...
-
Main Spar: install...
-
Main Spar: setup to...
-
Main Wing Spar:...
-
Main Wing Spar:...
-
Main Wing Spar:...
-
Main Wing Spar:...
-
Main Wing Spar:...
-
Main Wing Spar:...
-
Main Wing Spar:...
-
Making Wing Spar:...
-
Main Wing Spar:...
-
Main wing spar:...
-
Main Wing Spar: cut...
14: Wing Ribs
- (18)
-
Wing Ribs: Complete...
-
Wing Ribs: Attach...
-
Wing Ribs: Continue...
-
Wing Ribs: Attaching...
-
Wing Ribs: prime and...
-
Wing Ribs: match...
-
Wing Ribs: debur,...
-
Wing Ribs: prime and...
-
Wing Ribs: finished...
-
Wing Ribs: fitting...
-
Wing Ribs: finish...
-
Wing Ribs: prepping...
-
Wing Ribs: Pepping Ribs
-
Wing Ribs: prepping...
-
Wing Ribs: Prepping...
-
Wing Ribs: Continue...
-
Wing Ribs: built a...
-
Wing Ribs: begin...
15:Rear WingSpar
- (12)
-
Rear Spar: riveting...
-
Rear Spar: riveting...
-
Rear Spar: riveting...
-
Rare Spar: begin...
-
Rear Spar: Debur and...
-
Rear Spar: Debur and...
-
Rear Spar: Match...
-
Rear Spar: cut pass...
-
Rear Spar: Prepping...
-
Rear Wing Spar:...
-
Rear Wing Spar:...
-
Rear Wing Spar:...
16:Top Wing Skin
- (27)
-
Top Wing Skin:...
-
Top Wing Skin:...
-
Top Wing Skin: begin...
-
Top Wing Skin:...
-
Top Wing Skin:...
-
Top Wing Skin:...
-
Top Wing Skin:...
-
Top Wing Skin:...
-
Too Wing Skin:...
-
Top Wing Skin:...
-
Too Wing Skin:...
-
Top Wing Skin:...
-
Top Wing Skin:...
-
Too Wing Skin:...
-
Top Wing Skin: Begin...
-
Top Wing Skins:...
-
Top Wing Skins:...
-
Top Wing Skin:...
-
Top Wing Skin:...
-
Top Skins: dimple...
-
Top Skins: dimple...
-
Top Skin: finished...
-
Too Skin: debur...
-
Top Wing Skin:...
-
Top Wing Skins:...
-
Top Wing Skin:...
-
Top Skin: Begin...
17:Outbd LdgEdge
- (34)
-
Leading Edge:...
-
Outboard Leading...
-
Outboard leading...
-
Leading edge:...
-
Outboard Leading...
-
Outboard Leading...
-
Wings: Pitot Tube...
-
Leading Edges -...
-
Leading Edge:...
-
Leading Exge:...
-
Leading Edge:...
-
Leading Edge:...
-
Leading Edge:...
-
Leading Edge:...
-
Leading Edge: Cleco...
-
Leading Edge:...
-
Leading Edge:...
-
Leading Edge: Mask...
-
Leading Edge: Prime...
-
Leading Edge: Dimple...
-
Leading Edge: Dimple...
-
Leading Edge: finish...
-
Leading Edge: Rivet...
-
Leading Edge: Finish...
-
Leading Edge: finish...
-
Leading Edge: Debur...
-
Leading Edge: Remove...
-
Leading Edge: Remove...
-
Leading Edge: Finish...
-
Leading Edge:...
-
Leading Edge:...
-
Leading Edge:...
-
Leading Edge: begin...
-
Leading edge:...
18:Fuel Tank
- (60)
-
Fuel Tank: finish...
-
Fuel Tank: Fitting...
-
Fuel Tank: final...
-
Fuel Tank: right...
-
Fuel Tank: fitting...
-
Fuel Tank: fitting...
-
Fuel Tank: Initial...
-
Fuel Tanks: Machine...
-
Fuel Tanks: Pressure...
-
Fuel Tanks: install...
-
Fuel Tanks: baffle...
-
Fuel Tanks: prepping...
-
Fuel Tanks: Water...
-
Fuel Tanks: Right...
-
Fuel Tank: finished...
-
Fuel Tank: fitted...
-
Fuel Tank: Locktite 565
-
Fuel Tanks:...
-
Fuel Tanks: install...
-
Fuel Tanks: Finish...
-
Fuel Tanks: Riveting...
-
Fuel Tanks: finished...
-
Fuel Tanks: Continue...
-
Fuel Tank: installed...
-
Fuel Tanks: finished...
-
Fuel Tanks: begin...
-
Fuel Tank: Dimple...
-
Fuel Tank: Drill out...
-
Fuel Tank: Ordered...
-
Fuel Tank: Prep left...
-
Fuel Tank: Finish...
-
Fuel Tanks: Prepping...
-
Fuel Tanks: prepping...
-
Fuel Tank: install...
-
Fuel Tank: finished...
-
Fuel Tank: Continued...
-
Fuel Tank: continue...
-
Fuel Tank: Begin...
-
Fuel Tank: rivet...
-
Fuel Tank: prep...
-
Fuel Tank: mounted...
-
Fuel Tank: finish...
-
Fuel Tank: finish...
-
Fuel Tank: dimple...
-
Fuel Tank: Finish...
-
Fuel Tank: right...
-
Fuel Tank: debur...
-
Fuel Tank: for left...
-
Fuel Tank: prepping...
-
Fuel Tank: finish...
-
Fuel Tank: Continue...
-
Fuel Tank:...
-
Fuel Tank: Debur...
-
Fuel Tank: cut,...
-
Fuel Tank: rivet nut...
-
Fuel Tank: debur,...
-
Fuel Tanks: cut,...
-
Fuel Tank: scuff,...
-
Fuel Tank: prep root...
-
Fuel Tank: Prepping...
19:Wing Sys Rtg
- (9)
-
Wing Systems Rtg:...
-
Wing Systems: tested...
-
Wing Sys Rtg: Finish...
-
WIng Sys Rtg: begin...
-
Wing Sys Rtg:...
-
Wing Sys Rtg: Begin...
-
Wing Systems...
-
Wing Systems...
-
Wing systems...
20:Bot Wing Skin
- (41)
-
Bottom wing skin:...
-
Bottom wing Skins:...
-
Bottom Skins:...
-
Bottom wing skin:...
-
Bottom Wing Skin:...
-
Bottom wing skin:...
-
Bottom Wing Skin:...
-
Bottom Wing Skin:...
-
Bottom Wing Skin:...
-
Bottom Wing Skin:...
-
Bottom Wing Skin:...
-
Bottom Wing Skin:...
-
Bottom Wing Skin:...
-
Bottom Wing Skin:...
-
Bottom wing skin:...
-
Bottom Wing Skin:...
-
Bottom Wing Skin:...
-
Bottom wing skin:...
-
Bottom Wing Skin:...
-
Bottom Wing Skin:...
-
Bottom Wing Skin:...
-
Bottom wing skin:...
-
Bottom Wing Skin:...
-
Bottom wing skin:...
-
Bottom Wing Skin:...
-
Bottom Wing Skin:...
-
Bottom Wing Skin:...
-
Bottom Wing Skin:...
-
Bottom wing skin:...
-
Bottom wing skin:...
-
Bottom Wing Skin:...
-
Bottom Wing Skin:...
-
Bottom wing skin:...
-
Bot Wing Skin:...
-
Bot Wing Skin:...
-
Bot Wing Skin: Right...
-
Bot Wing Skin: cleco...
-
Bot Wing Skin:...
-
Bot Wing Skins:...
-
Bot wing Skin: begin...
-
Bot WIng Skin: debur...
21: Flap
- (22)
-
Flap: complete left...
-
Flap: setback,...
-
Flap: bond trailing...
-
Flap: rivet skins,...
-
Flap: replacement...
-
Flap: finish...
-
Flap: finish right flap
-
Flap: rivet bottom...
-
Flap: rivet right...
-
Flap: finish...
-
Flap: Prime...
-
Flap: debur and...
-
Flap: Dimple...
-
Flap: expose skin...
-
Flap: Complete...
-
Flap: Countersinking...
-
Flap:finish final...
-
Flap: fitted...
-
Wings: Replacement...
-
Flap: finish...
-
Flap: Begin Flaps
-
Flap:deburr nose...
22:Aileron
- (20)
-
Aileron: Left/Right...
-
Ordered Replacement...
-
Aileron: tape &...
-
Aileron: countersink...
-
Aileron: rivet lower...
-
Aileron: prime skins...
-
Aileron: discovered...
-
Aileron: cleco both...
-
Aileron: Drill right...
-
Aileron: Drill Right...
-
Aileron: rivet ribs...
-
Aileron: debur,...
-
Aileron: drill...
-
Aileron: bolt...
-
Aileron: drill ribs...
-
Aileron: Cleco...
-
Aileron: Debur...
-
Aileron: Prime...
-
Aileron: counter...
-
Aileron: begin...
23:Aileron Act.
- (8)
-
Aileron Act.: Finish...
-
Aileron Act.: rivet...
-
Aileron Act: finish...
-
Aileron Act: build...
-
Aileron Act.: Begin...
-
Aileron Act: Build...
-
Aileron Act: Cut,...
24:Wing Tip
- (2)
-
Wing Tip: AVEO ZipTips
-
Wing Tip: Ordered...
38:Roll Trim
- (2)
-
Finish electric roll...
-
Roll Trim: Build...
57:AP Servos
- (3)
-
AP Servos: Complete...
-
AP Servos: Complete...
-
Aileron Act.: Begin...
Fuselage
- (6)
-
Fuselage: Inventory
-
Fuselage: Inventory
-
Fuselage: Paid...
-
Received Fuselage Kit
-
Fuselage: Final Payment
-
Ordered Fuselage Kit
Finishing Ki
- (1)
-
Finishing Kit:...
Firewall
Controls
Avionics
- (4)
-
Avionics: mount...
-
Avionics:...
-
Avionics: DSUB 9 Pin...
-
Avionics: Advanced...
Lighting
Instrument Panel
Landing Gear
Engine
- (1)
-
Lycoming Thunderbolt...
Propeller
- (2)
-
Paid Balance on...
-
Ordered Hartzell...
Fuel System
Interior Finish
Paint / Decals
- (4)
-
SEM Primer
-
Primer - 6 Pack
-
SEM Primer 6-Pack
-
SEM 39683 Grey Self...
Inspection
Tools
- (26)
-
Tools: 4" thin...
-
Acrylic Drill Bits...
-
Tools: Rivet Cutter,...
-
Ordered C-Frame from...
-
3/16 Rivet Set
-
Tools: Rivet removal...
-
Home Depot: Clamps
-
Tools/Shop: Drill,...
-
Label Maker, Tape...
-
Swivel Flat Set and...
-
Back rivet bar,...
-
Ordered 5/32"...
-
Made "T"...
-
50a-15a Adapter,...
-
Rib Yoke for Squeezer
-
Cleaveland Tools:...
-
Cleaveland Order:...
-
Ordered Rivet Fan
-
Ordered 4" Yoke...
-
Ordered 2"...
-
Ordered Die Grinder...
-
Ordered Trailing...
-
Ordered mandrel...
-
Ordered Compressor...
-
Ordered Tool Kit...
-
Air Drill and...
Records
- (3)
-
Renewal of N-Number...
-
N-Number Reservation...
-
Reserve N-Number
Auto Entry
Supplies
- (6)
-
Ordered pro seal and...
-
Ordered Double SIded...
-
Tools: Cleaveland...
-
Vans: Tank Sealant,...
-
Cleaveland Tool:...
-
Cleaveland: 1"...
Insurance
- (2)
-
Insurance: Builders...
-
Builder's Risk...
Builder Name:
Dustin Newton
-
Project:
Vans - RV-14A
Total Hours:
1178.7
Total Flight Time:
Start/Last Date:
Apr 09, 2021 - No Finish Date
Engine:
Lycoming IO-390-119EXP
Propeller:
TBD
Panel:
AFS/Dynon/Avidyne
Friendly URL:
https://eaabuilderslog.org?s=NewtonRV-14A
Home or Last Project Picture
Nov 10, 2021
Deburred Replacement Spar Cap for the HStab
- (.5 hour)
Category: 8: HorizStab
This is the part that I misdrilled a few weeks ago. Next I will drill and debur then prime. Back on track!!!
Nov 12, 2021
Drilled Front Spar
- (2.5 hours)
Category: 8: HorizStab
Nov 13, 2021
Deburred all parts for front spar, primed and final assembly. Riveted rudder leading edge.
- (8.0 hours)
Category: 8: HorizStab
E5FBF232-DEB4-413C-813C-1F82550C273D.jpeg
DB354D60-D154-4202-98AB-292167A34C3A.jpeg
3B02C6FB-4F78-4AB1-856D-C41A2A9E693C.jpeg
43088406-F23F-4250-8A5E-B3F2BAC1B78F.jpeg
EB16C613-1CE6-47AF-9178-F572A9490934.jpeg
Nov 14, 2021
Begin prepping Hstab Ribs
- (2.5 hours)
Category: 8: HorizStab
5FE51904-0930-4BA5-B274-8965E698ED24.jpeg
B26659AD-5D12-47FA-A1B0-ACD9AD5C98D1.jpeg
Nov 15, 2021
Prepping HStab Ribs
- (2.0 hours)
Category: 8: HorizStab
This is a tedious process. I'm going very slow in an attempt to avoid as many issues as possible.
Nov 16, 2021
Prepping HStab Ribs
- (0.5 hour)
Category: 8: HorizStab
Nov 17, 2021
Prepping hstab ribs
- (2.0 hours)
Category: 8: HorizStab
Nov 20, 2021
Hstab: dimple ribs, prep skins
- (8.0 hours)
Category: 8: HorizStab
7C717EAF-36CD-4C25-9A9E-6DA6E19B8123.jpeg
Nov 21, 2021
Hstab: dimple and prime skins, countersink spars, prime ribs
- (8.5 hours)
Category: 8: HorizStab
658608E1-DA5A-4869-A025-945E6F50C048.jpeg
C23613CD-2797-4731-9323-E4FB68FE2578.jpeg
Nov 22, 2021
Hstab: begin assembling front spar and ribs
- (1.5 hours)
Category: 8: HorizStab
73A49EBC-9169-4472-954C-9D81D518A093.jpeg
19DFAF64-F084-4BBB-BCE0-7382DE6E2EF1.jpeg
Nov 23, 2021
Hstab: rivet ribs to front spar, finished cradles
- (3.0 hours)
Category: 8: HorizStab
20A13297-C856-4AEB-8DA3-86E3693B3671.jpeg
AE285751-EBB9-4801-881A-06E90DEDD2C9.jpeg
7EA302AA-BEE1-4A2A-8320-2141E24F9B99.jpeg
Nov 24, 2021
HStab: Begin Riveting nose ribs
- (2.5 hours)
Category: 8: HorizStab
Nov 25, 2021
Hstab: rivet nose ribs and half of the front spar
- (9.0 hours)
Category: 8: HorizStab
BC03B337-81F9-4CF8-A7BD-4DD458FA6EBE.jpeg
EF936DFC-A6A7-4286-AA4C-7C0E9E7534D7.jpeg
181A3D30-E3E6-4799-A295-8C4507901477.jpeg
Nov 26, 2021
Hstab: finish riveting skins to front spar assembly
- (7.0 hours)
Category: 8: HorizStab
Nov 27, 2021
Hstab: completed riveting skin. Section complete.
- (4.5 hours)
Category: 8: HorizStab
E868E429-43A3-443D-B089-1256DD98D941.jpeg
4FFBFAE5-6941-4170-882A-1E9B2E50188E.jpeg
EA1A97EA-9F2E-4271-9261-2A72184CA5BE.jpeg
F0F38351-062B-4F2A-918F-8363EBD3F0A9.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.